Manufacturing Infrastructure
Production Facility at Mewat, HARYANA
- Roto Molding: 8 Machines ranging from 1.5m to 4.3m
- Blow Molding: Machines ranging from 5L to 120L.
- Injection Molding: Machines ranging from 80 tons to 180 tons
- Prototype Development facility
- In House Design & Tool Room
- Post Molding facilities: Powder coating, Ultrasonic welding & Assembly lines.
Production Facility at Ranipet, TAMIL NADU
- Roto Molding: 4 Machines ranging from 2.2m to 4.3m
- Blow Molding: Machines ranging from 5L to 50L.
- Injection Molding: Machines ranging from 80 tons to 180 tons
- Prototype Development facility
- In House Design & Tool Room
- Post Molding facilities: Powder coating, Ultrasonic welding & Assembly lines.